Setting Long Test Duration

You can configure minimum duration of test to consider it long running or integration test.

To set long test duration:

1.  Select Typemock > Options.

The Options window is displayed.

2.  In the options list, select Typemock > SmartRunner .

 

3. Enter duration in Long Test Duration text box.

4.  Click OK.